Wimbledon renovation - Jan 2018 update

October 2, 2019

It's been a few months since we've posted an update on the house in Wimbledon and a lot has happened in that time. The vast garage/basement dig is complete, including the levelling of the drive outside. This has created a huge, flexible space which, due to the levelling of the drive, is at ground level, rather than underground. Meanwhile, the upstairs living area is taking shape, with the kitchen now installed and some of the wall finishes in place. The stone cladding that runs both inside and outside the property is in situ and the outside rendering and cedar cladding is nearly complete. The final finishes on the floor (polished concrete) were expected a few days after our visit. The attention to detail everywhere is outstanding, resulting in a property that is shaping up to be a unique and beautiful family home. We'll be back on site in March, at which point the project will be in the final stages of completion.